Senior Structural Engineer DPR & BOQNBC 105:2020 / NBC 205 StandardNEC Professional Standard
House Construction Cost & Engineering Materials Estimator
Complete architectural Bill of Quantities (BOQ), structural pillar sizing, footing schedules, rebar diameter distribution, DUDBC rate analysis, municipal approval fees, and bank loan disbursement timeline.
DUDBC Standard
Estimated Construction Cost
NPR 84,00,000
2,000 sq. ft. • 2.5 Storeys
Cost per Sq. Ft.
NPR 4,200
Estimated Construction Cost
NPR 84,00,000• Cost per Sq. Ft.: NPR 4,200
Sq. Ft.
Selected: 2.5 Floors
Standard Finish (रु ४,२०० / sq ft)
NPR 4200 / sq ft
Semi-Luxury Finish (रु ५,२०० / sq ft)
NPR 5200 / sq ft
Premium Luxury (रु ६,५०० / sq ft)
NPR 6500 / sq ft
Total Estimated Construction Budget (DPR)2000 Sq. Ft.
NPR 84,00,000
(At NPR 4,200 per sq. ft. • Material 65% + Labor 35%)
Materials Budget (65%)
NPR 54,60,000
Labor & Wage Budget (35%)
NPR 29,40,000
Click Material to Inspect Engineering Specs:
Senior BOQ
RCC Pillars
10 Pillars
NBC 205 Grid
First-Class Chimney Bricks
39,000 Units
~NPR 6,43,500
Cement
880 Bags
~NPR 6,33,600
Steel Rebar
78 Quintals
(7,800 kg) ~NPR 7,64,400
Compliant with NBC 105:2020 seismic design of buildings and NBC 205 mandatory rules of thumb for reinforced concrete buildings with masonry infill in Nepal.
Pillar (Column) & Footing Schedule
Ground footprint ~800 sq. ft. (2.5 storeys)
10 RCC Columns
Pillar Size
12" × 12"
300mm × 300mm (NBC 205)
Main Rebar Steel
6 to 8 Nos. 16mm
Fe500D TMT Rebar
Stirrups
8mm @ 4"–6" c/c
135° Seismic Hooks
Footing & Depth
5'0" × 5'0"
5.0 to 6.5 ft (1.5 to 2.0m) depth below natural ground level (NGL)
Plinth Tie-Beam: 9" × 12" (4 Nos. 12mm bars)
Roof Slab: 5" (125mm) M20 concrete
Nepal Engineering Council (NEC) Verification & DPR Metadata
Official Computerized Structural Preliminary BOQ generated by Nepali Calc Senior Engineering Suite.
Engineer Signature Block
Registered Civil / Structural Engineer
Engineering Thumb-Rule Estimate • नेपाल भवन संहिता आधारित
1000 Sq Ft House Cost — Cost & Material Breakdown
Building a 1,000 sq ft home in Kathmandu Valley costs between NPR 44 Lakh and NPR 49 Lakh for standard finish RCC construction. Material transport, river sand (वाशिङ बालुवा), and aggregate haulage account for key cost factors in valley municipalities.
What is the average cost of river sand and gravel per tipper in Kathmandu?
Direct Answer: A standard 10-wheeler tipper of washed river sand (वाशिङ बालुवा) typically costs NPR 26,000 to NPR 32,000, while crushed aggregate (रोडा/गिट्टी) costs NPR 28,000 to NPR 34,000 delivered to site in Kathmandu. (Government of Nepal Regulatory Standards)
Official Nepal Standard
Verified Calculation Formula
Current Fiscal Year 2083/84
1000 Sq Ft House Cost FAQs
A standard 10-wheeler tipper of washed river sand (वाशिङ बालुवा) typically costs NPR 26,000 to NPR 32,000, while crushed aggregate (रोडा/गिट्टी) costs NPR 28,000 to NPR 34,000 delivered to site in Kathmandu.